Pressure Vessels

ITB / Overview of our references / Our expertise / Pressure vessels Pressure Vessels Verification according to Pressure Equipment Directive 2014/68/EU The Pressure Equipment Directive regulates the manufacturing, design and conformity assessment requirements for Pressure Vessels before their commercialization. With the help of the FEM simulation, we provide verifications for our customers for pressure vessels…

Gas turbines

ITB / Overview of our references / Our expertise / Gast turbines Gas turbines Verification according to DIN EN 13445-3, AD 2000 and ASME BPVC Gas turbine power plants are characterized by high efficiency and flexibility. They can respond to fluctuations in power generation from renewable sources within a very short time. As a result,…

Fixture engineering

ITB / Overview of our references / Our expertise / Fixture engineering Fixture engineering Verification according to DIN EN 1993, DIN EN 13001, DIN EN 13155 and KTA The fixtures are used to erect, position, guide or support the machine or machine parts during their assembly, disassembly and operation. Customized solutions ranging from simple designs…

Load Handling equipment

ITB / Overview of our references / Our expertise / Load Handling equipment Load Handling equipment Verification according to DIN EN 13155 and DIN EN 14238 According to Directive 2006/42/EC, load handling equipment is defined as a component that is not part of the hoist, that enable the load to be gripped and that is…

Strength verification

ITB / The ITB service portfolio / Component verification / Strength verification Strength verification With more than 75% of the projects we have handled, a strength verification is required. Depending on the requirements, we perform Statics strength verification including stability verifications (buckling, bulging, structural stability) Verifications of low cycle fatigue Verifications of fatigue strength Fatigue…

ITER nuclear fusion reactor

ITER nuclear fusion reactor Construction of the world’s largest nuclear fusion reactor At Cadarache in southern France, an international research project has been working since 2007 to build a nuclear fusion reactor known as the ITER (International Thermonuclear Experimental Reactor). The long-term objective of the project is to use energy from the fusion of hydrogen…

Engineers

Engineers Calculation Engineer with ITB GmbH and part-time study ITB, the engineering company for technical calculations, is on a permanent growth trajectory: Grow with us! We offer you a diverse range of varied projects that you will rapidly take responsibility for as well as the option of ongoing professional development in part-time higher education degrees,…

InnoSentriS innovation forum

InnoSentriS innovation forum InnoSentriS innovation forum – SME digital twins platform From 1 May 2019 to 31 January 2020, our company implemented the “InnoSentriS – SME digital twin platform” project, which was funded by the German Federal Ministry of Education and Research (BMBF) under the SME Innovation Forums Subsidy Directive.   The aim of the…

AIN Dubai

AIN Dubai Largest ferris wheel in the world In the autumn of 2020, the largest ferris wheel in the world will be completed in the United Arab Emirates, the AIN Dubai. The AIN Dubai has a height of approx. 260 m and has capacity for 1,400 passengers in 48 cabins. A ride takes 45 minutes.…

Service life investigation of gas turbines

Service life investigation of gas turbines Probability analyses of geometric variations and their influence on the service life of a gas turbine housing Gas turbines are subjected to some of the highest loads of all machines. Massive operating pressures and in particular high temperatures, and the resulting loads, represent huge challenges for the calculation engineer.…

Predictive maintenance of aircraft engines

Predictive maintenance of aircraft engines Use of a digital twin for predictive maintenance of aircraft engines Digital twins increasingly play an important role in industry. They offer a universal platform for the administration, control and monitoring of machines, plants, and even individual products throughout their entire life cycle. However, the resulting advantages in areas such…

Component optimisation

ITB / The ITB service portfolio / Component analysis / Component optimisation Component optimisation Component optimisation allows competitive advantages to be achieved through higher component quality, while simultaneously keeping production and maintenance costs as low as possible. Based on our experience and through engineering approaches, we already regularly submit proposals for the optimisation of components…

Thermal calculation

ITB / The ITB service portfolio / Component analysis / Thermal calculation Thermal calculation The thermal calculation, using FEM simulation is useful for various applications. We perform the thermal calculation for the following questions for our customers Temperature calculation to determine the component stress Calculation of the temperature distribution in electronic components Simulation of the…